The Denver-Cheyenne Line (Denver Pacific Railroad.)
Proposition for Pacific Railroad to Reach Denver - Cheyenne Route Selected - Branch Line Proposed - Denver Pacific Incorporated and Built - Pro-Rata Controversy - Operated By Kansas Pacific - Consolidation With the Union Pacific.
In the original plan for the Union Pacific Railroad it was the intention that the line would run through Denver and from there directly West across the mountains to Salt Lake. When the line was finally located it passed through Cheyenne, leaving Denver some one hundred miles to the South, the reasons for this being the much shorter distance via Cheyenne as well as the decidedly better gradients that were possible via South Pass Route as against the routes via Denver and Berthoud or Evans Passes. The Denver Route was only given up after repeated efforts had been made to find a satisfactory line that way.
The City of Denver had for some time past been encountering a streak of hard luck-Failure of some of its most promising mines in 1861-Division of the Citizens over the Civil War in 1862 and 1863-Fire and Flood followed by the Indian War on the plains in 1864 cutting off communication with the East-then the grasshoppers plague with the diversion of the Pacific Railway. Vice President Durant had made the remark "it's too dead to bury," and this it was that spurred its citizens up.
In 1867 the Authorities of the Union Pacific Railroad offered to build a branch from some point on their main line to Denver, provided the citizens of that place would pay for the grading of the line and furnish right of way and grounds for terminal. The citizens of Denver were sore at being left to one side on the great overland route and gave the proposition but a luke-warm reception. It is true, County Commissioners of Arapahoe County, in which Denver is located, ordered an election in August, 1867, to vote on the proposition of issuing two hundred thousand dollars in bonds in favor of such a branch line. The election resulted in an overwhelming majority in favor of it, eleven hundred and sixty for to one hundred and fifty-seven against. The County Commissioners in their negotiations with the Union Pacific people coupled with the proposition certain conditions as to the route which the branch line should follow, which not being satisfactory to the Railroad people, they refused to accept the bonds on the conditions required.
On November 13th, 1867, George Francis Train addressed a public meeting at Denver on the subject of a connection between Denver and the Union Pacific Railroad and as a result the Denver Pacific Railway and Telegraph Company was organized five days later. On the day following the organization the directors met and elected Bela M. Hughes President, D. H. Moffat, Treasurer, and F. M. Case, Chief Engineer,-one fourth of the necessary funds being subscribed. An arrangement was made with the Union Pacific Railroad Company by the terms of which that Company was to complete the road as soon as it was ready for the rails. In other words the road was to be located, graded, and tied by the Denver Pacific Company, and ironed and equipped by the Union Pacific Railroad Company.
In connection with the Denver Pacific proposition an application was made to Congress for a land grant to assist in the construction of the road, but before this was acted upon the Kansas Pacific Railroad Company had agreed to transfer the land grant which they had been given by Congress so far as it applied to their proposed line from Denver North, and the application of the Denver Pacific Railroad to Congress was consequently changed to one for bonds. This was granted in 1869 to the amount of twenty-four thousand dollars per mile, or two and a half million dollars in all.
The grading was commenced May 18th, 1868, and the same fall was completed to Cheyenne, one hundred and six miles. Owing to the delay of Congress in acting on the bond proposition as well as on account of the financial stringency the Union Pacific Railroad Company was then encountering, the latter was not able to carry out its contract in regard to the completion of the Denver Pacific Railroad, and the arrangement was accordingly cancelled. An arrangement was then entered into with the Kansas Pacific Railway by which the latter Company took a certain amount of stock in the Denver Pacific Railroad and proceeded with its construction, completing the line between Cheyenne and Denver on June 22nd, 1870.
There was great rejoicing over the event. The last spike,-one of solid silver contributed by the miners of Georgetown, Colo.,-was driven by Governor Evans of Colorado.
The first engine to enter Denver was the first engine that the Union Pacific Railroad owned. It had been the first to enter Cheyenne, also the first into Ogden.
In 1872 the road passed into the control of the Kansas Pacific Railway Company by purchase who operated it until the consolidation of both lines with the Union Pacific Railroad Company in 1880.
The Kansas Pacific Railway was completed into Denver in August 1870, and immediately embarked in the through trans-continental traffic from Kansas City and points east thereof, via Denver and the Denver Pacific Railroad. This was, of course, in competition with the Main Line of the Union Pacific Railroad who in accepting business at Cheyenne were losing the haul from Omaha to that point. The Kansas Pacific Railway and the Denver Pacific Railroad people were insistent and with no little degree of correctness that under the original Charter the Union Pacific Railroad was compelled to accept business from all connections,-but the terms thereof were not fixed and instead of accepting a division based on the mileage of the respective lines as insisted upon by the two lines named, the Union Pacific Railroad officials demanded a constructive mileage that would result in their line from Cheyenne to Ogden receiving six tenths of their local rates between those points when the business was competition with their long haul via Omaha. An agreement to work on this basis pending judicial decision was made between the two interests in September 1874. The question would not down, it was brought before Congress, Courts, and Arbitrators constituting a "Cause Célèbre" the Pro-rata controversy.
Out of this grew the building of a rival line between Denver and Cheyenne wholly under the Union Pacific Railroad's control-locally known as the Colorado Central Railroad. This line was comprised of the Colorado Central Railroad, Denver to Golden, sixteen miles. It was commenced on New Year's Day 1868, being the first railroad in the state of Colorado. Its extension to Longmont, built in 1871, and the line Longmont to Cheyenne completed in 1877. This line was some one hundred and thirty miles against one hundred and six by the Denver Pacific Railroad, notwithstanding which it was used by the Union Pacific Railroad as its Denver connection until the adjustment of the differences between the different interests, which was brought about by an agreement made June 1st, 1878, by which the Kansas Pacific Railway and the Denver Pacific Railway were to be operated by the Union Pacific Company. This was followed by an absolute merger of the three roads, in January 1880 the new combination being known as the Union Pacific Railway Company.(Back to Content)